|
|
|
|
| LEADER |
00851cam a2200241 7i4500 |
| 001 |
0000028229 |
| 005 |
20241121090000.0 |
| 008 |
190114 enka eng |
| 020 |
|
|
|a 9781138651906
|
| 040 |
|
|
|a INS
|
| 090 |
0 |
0 |
|a TH438.15
|b C43 2017
|
| 100 |
1 |
|
|a Chan, Daniel W. M
|e author
|
| 245 |
1 |
0 |
|a Target cost contracting strategy in construction :
|b principles, practices and case studies
|c Daniel W.M. Chan and Joseph H.L. Chan.
|
| 264 |
|
1 |
|a London:
|b Routledge,
|c 2016.
|
| 300 |
|
|
|a xii, 172 pages:
|b illustrations;
|c 24 cm.
|
| 336 |
|
|
|a text
|2 rdacontent
|
| 337 |
|
|
|a unmediated
|2 rdamedia
|
| 338 |
|
|
|a volume
|2 rdacarrier
|
| 650 |
|
0 |
|a Construction industry --
|x Cost control
|
| 650 |
|
0 |
|a Construction contracts
|
| 650 |
|
0 |
|a Target costing
|
| 700 |
1 |
|
|a Chan, Joseph H. L.
|
| 999 |
|
|
|a 1000003622
|b BOOK
|c Open Shelf
|e PERPUSTAKAAN INSPEN
|