Construction scheduling,cost optimization and management
| Main Author: | |
|---|---|
| Other Authors: | |
| Format: | Book |
| Published: |
Spon Press,London,
2001.
|
| Subjects: |
| LEADER | 00555cam a2200169 7i4500 | ||
|---|---|---|---|
| 001 | 0000010388 | ||
| 005 | 20050615090000.0 | ||
| 020 | |a 041524417X | ||
| 040 | |a INS | ||
| 090 | 0 | 0 | |a TH438.4. |b A33 2001 |
| 100 | 1 | |a Hojjat Adelli | |
| 245 | 1 | 0 | |a Construction scheduling,cost optimization and management |c Hojjat Adeli. |
| 260 | |a Spon Press,London, |c 2001. | ||
| 300 | |a 352p; |c 23 cm. | ||
| 650 | 0 | 0 | |a Construction industry -- |x management production scheduling:building -- |x Cost control |
| 700 | 0 | |a Asim Karim | |
| 999 | |a 0000008466 |b BOOK |c Open Shelf |e PERPUSTAKAAN INSPEN | ||


